Basement Plumbing Rough-In

The plumbers came out on Monday and did the rough-in work in the basement. All the drain lines that would eventually be contained within the concrete slab had to be installed and inspected by the county before the concrete could be poured. The lines were run, capped and pressurized to 5 psi. The whole thing took two guys a little less than a day.

Comments

Popular posts from this blog

On The Road Again

Aerial Survey