Gable end closed in despite wind
Things went a little slower this week, but then again most of the work was done while being up 24 feet in the air. We used the crane to get the main girder into position. The rest was done was brute force. Tim, Bobby, and "Part Time" Steve provided the muscle to get the four LVLs into place. Let me tell you it was no small task. Every day I'm amazed by the amount of engineered material that has gone into this house.