Framing Stage One Complete



We finished up the end of the second week by setting the floor joists for the second floor sleeping area. Things has progressed very nicely despite several days of strong wind. I got turned into a Tyvek burrito after one especially strong breeze. Tim and his crew are very impressive. They are all about precision. Everything is checked and doubled-checked. They are a great crew to work with.

The pictures attached show the west wall of the bathroom going up. The wall gets laid out on the floor, checked for square, sheeting is applied, Tyvek is tacked on, and then we lift it into place and secure it to the floor and adjoining walls.