A lot has been happening



It seems that the busier I am the fewer pictures I take. Here is a quick recap of the last week's happenings. Preparations for the concrete slab happened on Tuesday. There was one day delay because of a late materials delivery and the county required that there be an inspection to make sure that the slab was insulated properly before any concrete was poured. The pour went off very well. We only had a wheel barrow full of concrete left. (Just enough to fill one last core in the block.) I picked some ferns that were growing on a shaded north bank near the creek and laid them into the wet floor. Tim and James did a really nice job on the finish work. The colored concrete, leaf imprints, and saw cuts turned out really nice.

The week finished with John and me taking a very long and bumpy ride from the house site to the barn on a large trenching machine. It was a bit scary at times, especially when going straight down the steep side of the hill. It was really good to get that part of the job done. There were a few spots where the rocks were to much to handle. I'm going to see if I can get Melvin or Pete to come out and finish things up. It will be super helpful to get the temporary power going. Generators are way too noisy.

The framers jumped right on things and at the end of this last week the first floor deck was complete. It is really cool to watch the structure come together.

Comments

Popular posts from this blog

On The Road Again

Aerial Survey